5.11 Tactical Build-to-Suit LEED Attributes
Sustainable Sites
- Implemented Erosion and Sedimentation Control (ESC) and Stormwater Pollution Prevention (SWPPP) to reduce stormwater runoff and sedimentation of local waterways
- Preferred parking for LEV/FEV
- Total parking provided did not exceed local code
- Site provided landscaped open space that exceed local code
- A reflective roof membrane was installed to reduce heat island
- Improved the quality of stormwater runoff
Water Efficiency
- Reduce water consumption by 41% through mandatory installation of low-flow plumbing fixtures
Energy & Atmosphere
- Project underwent commissioning to ensure proper design, installation, and operation of equipment/systems
- Reduced annual energy consumption/cost by 40% through installation of skylights and reduced lighting power density (LPD) for exterior lights
Materials & Resources
- 31% of permanently-installed building products contained recycled content
- 35% of permanently-installed building products were extracted/manufactured within 500 miles of project site
Indoor Environmental Quality
- Building ventilation exceeded local and national code
- Indoor air quality management plan during construction
- Low-emitting construction materials installed to improve occupant comfort/satisfaction