Sustainable Sites

  • Implemented Erosion and Sedimentation Control (ESC) and Stormwater Pollution Prevention (SWPPP) to reduce stormwater runoff and sedimentation of local waterways
  • Preferred parking for LEV/FEV
  • Total parking provided did not exceed local code
  • Site provided landscaped open space that exceed local code
  • A reflective roof membrane was installed to reduce heat island
  • Improved the quality of stormwater runoff

Water Efficiency

  • Reduce water consumption by 41% through mandatory installation of low-flow plumbing fixtures

 Energy & Atmosphere

  • Project underwent commissioning to ensure proper design, installation, and operation of equipment/systems
  • Reduced annual energy consumption/cost by 40% through installation of skylights and reduced lighting power density (LPD) for exterior lights

 Materials & Resources

  • 31% of permanently-installed building products contained recycled content
  • 35% of permanently-installed building products were extracted/manufactured within 500 miles of project site

 Indoor Environmental Quality

  • Building ventilation exceeded local and national code
  • Indoor air quality management plan during construction
  • Low-emitting construction materials installed to improve occupant comfort/satisfaction